Most protection engineers read an IDMT curve forwards: take a fault current, divide it by the pickup setting to get the multiple M, and read off the operating time. That answers "how fast will this relay trip?"
In a grading review, though, the question often runs the other way: "this relay has to clear in 0.5 seconds — what fault current does that correspond to?" That reverse check turns a time requirement into a current threshold you can compare directly with the fault study. It is worth working through by hand at least once, because it shows just how flat the standard-inverse curve is.
The forward formula first
For the IEC 60255-151 standard-inverse curve, the operating time is:
t = TMS × 0.14 / (M^0.02 − 1)
where M = I / I_pickup — the fault current as a multiple of pickup — and TMS is the time multiplier setting. The same formula, with the full set of IEC and IEEE curve constants, is printed on GridCircuits' free IDMT relay curve calculator, which also plots the curve so you can see the whole time-current characteristic, not just one point.
Turning the formula around
Solve for M:
M^0.02 − 1 = TMS × 0.14 / tM^0.02 = 1 + (TMS × 0.14 / t)M = (1 + (TMS × 0.14 / t))^50
The exponent 50 comes from 1 / 0.02. That large exponent is the whole story: a small change inside the brackets produces a big change in M.
Worked example
Take an IEC standard-inverse element with TMS = 0.2, and a grading requirement that it operates in 0.5 s.
TMS × 0.14 / t = 0.2 × 0.14 / 0.5 = 0.056M^0.02 = 1.056M = 1.056^50 ≈ 15.25
So the relay reaches 0.5 s at about 15.3 times pickup. With a pickup of 600 A, that is a fault current of roughly 15.25 × 600 ≈ 9,150 A.
Check it forwards to be sure:
t = 0.2 × 0.14 / (15.25^0.02 − 1) = 0.028 / 0.056 = 0.50 s
A quick sense-check against the calculator page's own worked example: at M = 10 and TMS = 0.1 the standard-inverse time is 0.297 s, so at TMS = 0.2 and M = 10 it would be 0.594 s. Asking for 0.5 s at TMS = 0.2 therefore needs a multiple somewhat above 10 — 15.3 fits.
When the reverse check earns its keep
- Grading reviews. A downstream device must clear before the upstream one, with a grading margin (typically 0.2–0.4 s, plus breaker interrupting time). The reverse check converts that required time into a current threshold, which you can compare with the fault levels from the study.
- Sensitivity checks. What is the smallest fault current that still trips within the required time? Note that below M ≈ 1.1 most relays do not operate reliably, so a reverse answer landing near pickup deserves a second look.
- Setting sanity checks. If the reverse calculation says the relay only reaches the required time at a multiple far above the available fault current, the setting — or the curve choice — needs revisiting.
Mind the curve shape
The standard-inverse curve is shallow: once you are well above pickup, a large change in M buys only a small change in time. That is why the reverse answer (15.3×) can look surprisingly high for a 0.5 s requirement. Steeper curves — very inverse or extremely inverse — behave differently, so always plot the whole curve instead of trusting a single point.
Bottom line
Forwards: time from current. Backwards: current from time. Both use the same formula; the reverse check just inverts it. Keep it in your grading-review toolkit, and always verify the result forwards before writing it into a settings sheet.
IDMT results are for preliminary design, estimating, and education — verify against the relay manufacturer's data before issuing settings.