India’s second-phase semiconductor scheme opened its first application window with implementation guidelines dated 16 September 2026. For the pillars currently open, machines and materials, fabs, and ATMP and OSAT, the window runs for three years, up to about 15 September 2029. Three years sounds generous. For semiconductor projects, it is not as long as it looks.
What the window covers
The scheme, notified as the Scheme for Development of Semiconductor Design and Manufacturing Ecosystem in India with an outlay of Rs 1,27,500 crore, is effective from 31 August 2026. The current guidelines cover:
• Pillar 2, Machines and Materials (Category 4): 30% of capex, plus a production-linked incentive for equipment makers.
• Pillar 3, Fabs (Categories 5 to 7): 40% of capex for silicon fabs, 35% for compound, photonics, sensor, discrete and display fabs.
• Pillar 4, ATMP and OSAT (Category 8): 35% for advanced packaging, 25% for legacy packaging.
Guidelines for Pillars 1, 5 and 6, covering design, R&D and talent, are not yet open.
Why three years goes quickly
Before a semiconductor project can submit a strong application, it usually needs:
• A technology decision and, often, a technology partner.
• A site, with power, water and logistics suitable for semiconductor manufacturing.
• A detailed project report and eligible capex schedule.
• A financing plan, including the promoter’s equity share.
• Customer discussions or commitments, especially for fabs and packaging.
• An applicant entity that meets the revenue threshold.
Each of these can take months. For large fabs, international partnerships alone can take a year or more to negotiate.
A planning approach
Work backwards from the window’s end. If a project needs eighteen months of preparation, it must start well before the final year to leave room for queries, revisions and unexpected delays. For smaller projects, such as raw materials or test facilities, preparation may be faster, but should still begin early.
It also helps to think about competition for attention. Applications submitted early in the window may benefit from evaluators having fewer files in front of them, while late applications may face a rush.
Planning for the pillars not yet open
Companies interested in design, R&D or talent support should use this period to prepare. Design companies can organise IP documentation and product roadmaps. Research institutions can develop project proposals. Training organisations can build curricula and partnerships. When those guidelines open, prepared applicants will be ready to move quickly.
A full summary of each pillar and what is open now is available in this guide on how to apply for Semicon 2.0.
Different projects, different lead times
Not every project needs the same preparation time. A raw materials plant, with a minimum capex of Rs 50 crore, may be ready to apply within months if the company already has the core chemistry and a site. A test facility, from Rs 100 crore capex, may need time to finalise its equipment list and customer base. Equipment projects, from Rs 300 crore, often need technology partners. Packaging units, from Rs 1,000 crore, and fabs, from Rs 500 crore for specialty fabs to Rs 20,000 crore for silicon fabs, typically need the longest runway. Matching the start date to the project’s real complexity is the simplest way to avoid a last-minute rush near the end of the window.
The practical message
Treat the application window as a deadline for submission of a complete, well-supported proposal, not as a period of leisurely consideration. Map your project to a category now, test it against the thresholds, and begin assembling the technical, financial and corporate groundwork. In semiconductors, the companies that move early with well-prepared applications are the ones best placed to benefit.