Trust-Region Benders for Scalable Multiperiod Expansion Planning for Transmission and Storage
arXiv cs.SY0 views
arXiv:2610.32862v1 Announce Type: new Abstract: Transmission expansion planning (TEP) seeks to identify cost-effective investment strategies that enable power systems to reliably meet future demand, while accounting for the location, timing, and operational impacts of infrastructure upgrades. As demand grows and renewable penetration increases, there is growing interest in jointly modeling energy storage investments to enhance operational flexibility. This work presents a multiperiod formulation that co-optimizes transmission reconductoring and energy storage installation across multiple planning periods. To solve the resulting large-scale problem efficiently, a Benders decomposition with per-period trust-region stabilization and a relaxation-based warm-start procedure is proposed. The approach is demonstrated on a 2,000-bus Texas system, producing an investment plan spanning 2030-2045 with optimality gap below 1.0%, and is compared against a rolling-horizon approach to highlight the benefits of multiperiod coordination.
Source:https://arxiv.org/abs/2610.32862PreviousDensity control of large-scale multi-agent systems via tuning of agent interactionsNextClassical, Machine Learning, and Hybrid Solvers for Partial Differential Equations: An Evidence-Weighted Review and Decision Framework
Related posts
Three dates that catch a hard-coded time-zone bug in a session clock
0dev.to
Laravel N+1 Query Problem: How to Find and Fix It
0dev.to
LongCat-2.5 at $0.30/$1.20: Thinking Locks Temperature, 1M Context, and Vendor Benches Between Opus 4.8 and 5
0dev.to
Shipped: two packages, a registry listing, and the first seals
0dev.to
AI Agent Memory Needs Garbage Collection, Not Just Storage
0dev.to

Securing the Analytics Pipeline and Pivoting for Demo Day
0dev.to