Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines
arXiv cs.SY0 views
arXiv:2611.25223v1 Announce Type: new Abstract: Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.
Source:https://arxiv.org/abs/2611.25223PreviousReliability-based Sizing of Energy Storage for Large Load IntegrationNextData-driven Linearization of Operational Dynamics of Soft Open Points in Power Distribution Networks
Related posts
Installare un file browser self-hosted come APK Android: solo 64 bit, e questo conta
0dev.to
The pane that always said UNKNOWN
0dev.to
Four agent bugs where the safety check looked at the wrong thing
0dev.to
Guardrails vs moderation APIs
0dev.to

Gas supplier giant Equinor hit by cyberattack — Europe's biggest gas supplier says it has now restored services
0TechRadar
What Is Futures Earn and How Does It Work for Traders?
0HackerNoon